| Independent NI43-101 Report | |
| Download PDF File (2.22mb) | |
| Technical Report on the Simuku Property, Papua New Guinea | |
| Download PDF File (2.1mb) | |
| Expanded Technical Report on the Simuku Property, Papua New Guinea | |
| Download PDF File (4.5mb) | |
Exploration History
Discovery of Simuku system; Drilled Rapilli Prospect (3 x drillholes totalling 916m) |
||
Drilled Rapilli Prospect (4 x drillholes totalling 607m) - 83SM-1 to 83SM-4; Regional Stream sampling |
||
| Regional compilation of data | ||
Drilled Simuku prospect (4 x drillholes totalling 625m); Chalcocite enrichment recognised; Mapping and sampling |
||
City Resources |
Explored Talelumas Prospect for gold with soil sampling and mapping | |
| Acquired Simuku tenement | ||
Placer JV with Macmin/NGG |
Geophysics, bulldozer trenching and ridge/spur soils at Simuku Prospect; Placer withdrew despite recommending further work. |
|
| 3200m of bulldozer trenching; Drilled Simuku prospect (8 x drillholes totalling 857m) - SMH-5 to SMH-12 | ||
Regional assessment, mapping, geochemical sampling; Withdrew after merger with Phelps Dodge |
||
NGG |
Petrography by Terry Leach; Auger soil sampling; Bulldozer trenches (2 x totalling 3246m) to test copper soil anomalies. 844 trench samples and 55 grab samples taken. |
|
20km bulldozer trenching including 12km of new trenching which located the Horseshoe high grade molybdenum zone |
||
| Drilled Horseshoe (2 x drillholes totalling 170.9m) confirming the presence of high grade Mo mineralisation | ||
| Drilled fifteen diamond holes for 4194 metres; Secondary copper enrichment near surface; 0.7 to 1% Copper Inferred Resource of 200Mt at 0.47% Copper Equivalent. | ||