Projects - Mt. Nakru (updated September 2008)
Porphyry Copper Systems

The Mt Nakru property is owned 100% by Copper Quest (PNG) Ltd.

The Mt Nakru 1 porphyry copper-gold system has defined mineralisation over an area of more than 10 square kilometres. Exploration has included 15 drill holes (1650m) with best drill results such as 74m of 0.78% copper, 8.6m of 1.3 g/t gold, and 94m of 0.46 g/t gold and 0.43% copper. Previous best trench results were 45m of 2.5 g/t gold, 245m of 0.8 g/t gold, 3m of 17 g/t gold, 23m of 1.43% copper and 4m of 6.6% copper. Exploration is impacted at Mt Nakru because of a thick blanket of volcanic ash, up to 8m thick.

Exploration in 2005 included approximately 6 kilometres of bulldozer excavator trenching. 1,595 channel samples were collected.

During 2008 drilling and trenching are currently underway.

A ground geophysical 3D induced polarisation survey is currently underway at Nakru 1 and Nakru 2.

At Nakru 2, significant polymetallic targets occur within a 700m diameter interpreted breccia pipe. Historical samples had included 25m at 1.43% copper in trench, 4m at 6.6% copper in trench and 19.9% copper in outcrop samples.

"Readers are advised to refer to Announcements and Projects sections of this web site for complete information of drill and trench results".

 

 

Project
Mt. Nakru Project Simuku Simuku
Mt. Nakru Project